Well, nothing else happened in February, but it looks like things are about to take off. This past week the weather finally cooperated so they could dig and pour the foundation. They still have to do the posts and foundation walls, but the footings have been poured. Framing could potentially start next week! Here are a few pictures:


February 7, 2013 - This is where we left off last time, and it stayed this way for a good month. I probably made 8+ trips out there during this time hoping for some progress but there was none.


March 7, 2013 - After a few rainy weeks, it finally calmed down enough to dig the footings. I didn't get any action shots, but since they had already finished for the day I got to walk around and do some inspection. In this picture you can see the footings that will hold the columns for the side porch.


March 9, 2013 - Me and Linz went out to the site on the 8th, but they had not poured the concrete yet. There was a crew there waiting for the truck to show, but I had to get back to work. I drove out this morning and got to see the results of the pour. In this picture, the breakfast room is to the left, the master is front center, and the outline of the garage to the right.


March 9, 2013 - Lamp post shot. One day there will be a house back there, and maybe a wardrobe to  Narnia.